Sustainability / Design fact sheet

Put computing
heat to work.

SparkDCS targets PUE of 1.20–1.25, with heat recovery designed for district networks through Vital Energi.

Our commitments

  1. Energy efficiency

    1.20–1.25 PUE

    Size cooling and electrical systems around this design target.

  2. AI hall cooling

    30–100+ kW / rack

    Provide liquid-cooling readiness for high-density AI halls.

  3. Cooling water

    Closed-loop

    Recirculate cooling water to minimise make-up demand.

  4. Power supply

    On-site + private wire

    Use a grid-backed energy centre, with a route to lower-carbon fuels.

  5. Heat export

    Up to 30 GWh / year

    Develop district heat supply with Vital Energi; illustrative phase target.

  6. Biodiversity

    At least 10% net gain

    Measure habitat gains against the statutory biodiversity metric in England.

Design targets and specifications; operating performance will depend on IT load and final engineering.

Heat reuse / Designed in

A second use
for computing heat.

01 / Source

Data hall

Closed-loop cooling captures server heat.

02 / Transfer

Heat recovery

Heat exchangers transfer energy; heat pumps raise its temperature where required.

03 / Use

District network

Insulated pipes carry heat to buildings and return cooler water.

Up to 30 GWhrecovered heat / year

Illustrative phase target with Vital Energi, subject to heat demand and network delivery.

Energy equivalent to 2,500 households’ annual gas use, using Ofgem’s 2023 benchmark rounded up to 12 MWh per household; not a forecast of homes supplied.

Specification / Design stage

Design basis

SparkDCS design targets and their conditions
ParameterTarget / basisNote
Energy efficiencyPUE 1.20–1.25Design target · total facility energy / IT energy
AI rack density30–100+ kW per rackDesign range · liquid-cooling ready
Enterprise hallsLower rack densitiesSized to customer equipment
WaterClosed-loop coolingMake-up demand depends on final cooling design
PowerEnergy centre + private wireGrid-backed; fuel transition subject to supply and equipment
Recovered heatUp to 30 GWh/yearIllustrative phase · dependent on load and heat offtake
Market & regulation

Context

The IEA’s 2025 base case projects European data-centre electricity demand rising 70% between 2024 and 2030. IEA, Energy and AI (2025).

England’s Environment Act 2021 introduced a 10% biodiversity net gain requirement for non-exempt development, implemented from 2024. Defra guidance.